Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects
https://doi.org/10.24017/science.2019.2.3
Abstract views: 1848 / PDF downloads: 1217Abstract
In this study, the Laborer’s Efficiency (LE) in building projects in Sulaimani City practically on field sites were investigated for Gypsum plastering (GP). Accordingly, four constructional different buildings as Multistory, commercial and houses were considered. Overall 11 main important factors during 30 practical records on field sites were practically observed. As a result, for the first time the Laborers’ Efficiency (LE) was measured and classified into three categories high, medium and low for two specific heights which were 0-2 m and 2-3 meters height of walls. On the other hand, it concluded that the LE for the height of 0-2m affected on LP from 15.18 to 21.35m2/hr., with a proportion of 40.6%. In addition to the LE affected-on LP for the height of 2-3m and varied the LP range between 13.33-15 m2/hr., with a proportion of 12.5%.
Keywords:
References
[2] P. N. Farnad Nasirzadeh, "Dynamic modeling of labor productivity in construction projects," Project Management, p. 903-911, 2013.
https://doi.org/10.1016/j.ijproman.2012.11.003
[3] o. Dictionary.com, "Dictionary," Collins, 2019. [Online]. Available: https://www.dictionary.com.
[4] "Dictionary.com," Dictionary.com, [Online]. Available: https://www.dictionary.com/browse/skill-fulness.
[5] E. E. G. M. M. A. U. Ibrahim Halil Gerek, "Evaluation of Plastering crew Performance in Building Projects Using Data Envelompent Analysis," Technological and Economic Development of Economy, vol. 22, no. 6, pp. 933-935, 2016.
[6] P. A. G. P. Mr.A .A. Attar, "A Study of Various Factors Affecting Labour Productivity and Methods to Improve It.," IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), pp. 11-14, 2009.
[7] S. A. S. Dozzi, Productivity in Construction, Canada: Institute for Research in Construction, 1993.
[8] K. M. E.-G. Mostafa E. Shehata, "Towards improving construction labor productivity and projects' performance," Alexandria Engineering Egypt, vol. 50, no. 1, pp. 321-330, 2011.
https://doi.org/10.1016/j.aej.2012.02.001
[9] E. Z. A. A. Mostafa, "Study of the Meassurement of Labor Productivity in the Palestinian Construction Industry: The Gaza Strip," The Islamic University of Gaza-Palestine, p. 11, 2003.
[10] 1. W. F. M. H. Randolph Thomas, "Modeling Construction labor Productivity," University of Aberdeen site, 1990.
[11] L. A. E. Brent G. Hicksona, "Factors affecting Construction Labour Productivity in Trinidad and Tobago," Association of Professional Engineers of Trinidad and Tobago, vol. 42, 2013.
[12] S. M. ,. Z. A. M. &. P. E. M. Adnan Enshassi, "Factors affecting labour productivity in building projects in the Gaza strip," Civil Engineering and Management, vol. 12, no. 4, pp. 245-254, 2007.
https://doi.org/10.3846/13923730.2007.9636444
[13] S. D. a. J. Mbachu, "On -site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures," Australasian Journal of Construction Economics and Building, vol. 11, no. 3, p. 22, 2011.
https://doi.org/10.5130/AJCEB.v11i3.2120
[14] M. Gerges, "Investigation into the labour factors affecting project performance within the Egyptian construction industry," Coventry University, pp. 30-34, 63-88, 2015.
[15] S. A. Rex Asibuodu Ugulu, "Dataset on Investigating the role of onsite learning in the optimisaton of craft gang's productivity in the construction industry," ELSEVIER, vol. 1, no. 1, pp. 1-8, 2017.
[16] Y. Dires, "Building Deffects due to Poor Workmanship in Addis Ababa:The Case Study on 20/80 Condominium Houses," Construction Technology and Management, pp. 80-91, 2016.
[17] D. W. M. C. a. N. M. Kumaraswamy, "A comparative study of causes of time overruns in Hong Kong construction projects," International Project Management, vol. 15, no. 1, pp. 55-63, 1997.
https://doi.org/10.1016/S0263-7863(96)00039-7
[18] K. A.-H. a. Z. A. M. Adnan Enshassi, "Labor Productivity Measurement in Building Projects," Islamic University, vol. 19, no. 1, pp. 103-119, 2011.
[19] H.-S. Park, "Conceptual Framework of Construction Productivity Estimation,," Civil Engineering, vol. 10, pp. 311-317, 2006.
https://doi.org/10.1007/BF02830084
[20] Y. H. A. Abdulaziz Taj Elsir Mohamed Osman, "ESTIMATE OF LABOUR PRODUCTIVITY IN SUDANESE CONSTRUCTION INDUSTRY," ResearchGate, vol. 63, no. 1, pp. 23-29, 2017.
[21] H. MUHAMMAD ASADULLAH TAHIR, "FACTORS AFFECTING LABOR PRODUCTIVITY IN BUILDING PROJECTS OF PAKISTAN," International Journal of Management and Applied Science, vol. 1, 2015.
[22] R. F. A. Sherif M. Hafez, "Critical factors affecting construction labor productivity in Egypt," American Journal of Civil Engineering, vol. (2), no. 2, pp. 35-40, 2014.
https://doi.org/10.11648/j.ajce.20140202.14
[23] A. V. T. a. J. Sudhakumar, "Factors Influencing Construction Labour Productivity: An Indian Case Study," Journal of Construction in Developing Countries, vol. 19, no. 1, p. 53-68, 2014.
[24] A. S. J. L. P.-T. S. G. G. Robles, "Labor Productivity in the Construction Industry-Factors Influencing the Spanish Construction Labor Productivity, International Journal of Civil," Architectural, Structural and Construction Engineering, vol. 8, p. 10, 2014.
[25] M. E.-G. a. R. F. A. Khaled, "Factors Influencing Construction Labor Productivity in Egypt," Management in Engineering, 2012.
[26] M. M. Gundecha, "STUDY OF FACTORS AFFECTING LABOR PRODUCTIVITY AT A BUILDING CONSTRUCTION PROJECT IN THE USA: WEB SURVEY," North Dakota State University, 2012.
[27] P. A. G. P. Mr.A .A. Attar, "A Study of Various Factors Affecting Labour Productivity and Methods to Improve It.," IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), pp. 11-14.
[28] K. C. O. N. A. J. N. N. I. S. P. Isaac A. Odesola, "A Comparative Evaluation of Labour Productivity of Wall Plastering Activity Using Work study," PM World, vol. 4, no. 5, pp. 1-10, 2015. Kurdistan Journal of Applied Research | Volume 4 - Issue 2 - December 2019 | 39.
[29] S. M. ,. Z. A. M. &. P. E. M. Adnan Enshassi, "Factors affecting labour productivity in building projects in the Gaza strip," Civil Engineering and Management, vol. 12, no. 4, pp. 245-254, 2010.
[30] D. W. M. C. a. M. M. Kumaraswamy, "A comparative study of causes of time overruns in Hong Kong construction projects," Project Managemen, vol. 15, no. 1, pp. 55-63, 1997.
https://doi.org/10.1016/S0263-7863(96)00039-7